Uttar Pradesh Unveils Ambitious Plan for 27 Integrated Manufacturing & Logistics Clusters.

Uttar Pradesh unveils 27 manufacturing-logistics clusters along 5 expressways across 13,240 acres, aiming to transform the state’s industrial landscape.

Key Highlights

✅ 27 integrated clusters across 26 districts
✅ 13,240 acres allocated along 5 expressways
✅ 9,864 acres already acquired (74% of total land)
✅ Multi-modal connectivity: Road, rail & air linkages
✅ Focus sectors: Manufacturing, logistics & allied industries


UP’s Mega Infrastructure Push: 27 Industrial Clusters Along Expressways

Lucknow, Uttar Pradesh – In a transformative move for India’s largest state economy, Chief Minister Yogi Adityanath has announced the development of 27 Integrated Manufacturing and Logistics Clusters (IMLCs) spanning 13,240 acres across Uttar Pradesh’s expressway network.

Cluster Distribution & Key Features

Expressway NodeCoverageLand AreaDistricts
Bundelkhand ExpresswayLargest node
Ganga ExpresswayWidest reach3,707 acres11 districts
Gorakhpur LinkSmallest node514 acres2 districts
Purvanchal Expressway
Agra-Lucknow Expressway

Key Infrastructure Advantages:
✔ Competitive land pricing
✔ Dedicated logistics facilities
✔ Expressway connectivity (30-40% travel time reduction)
✔ Transparent land allocation system
✔ Skilled labor availability


Strategic Impact on UP’s Economy

1. Investment Magnet

  • Targets global manufacturers in auto, electronics, FMCG
  • Potential to attract ₹1 lakh crore+ investments

2. Employment Generation

  • Expected to create 5 lakh+ direct/indirect jobs

3. Logistics Revolution

  • Multi-modal connectivity reduces supply chain costs
  • Links Delhi-NCR with eastern UP & Bundelkhand

4. Regional Development

  • Bridges west-east industrial divide
  • Brings Bundelkhand & Purvanchal into mainstream growth

Leadership Vision

CM Yogi Adityanath:
“These clusters will transform UP into India’s manufacturing powerhouse. Our expressway-linked industrial nodes offer world-class infrastructure with seamless connectivity.”


Implementation Roadmap

  • Phase 1 (2025-26): 15 clusters operational
  • Phase 2 (2026-28): Full 27-cluster rollout
  • Land acquisition: 3,376 acres remaining

Conclusion

This mega initiative positions UP as India’s next manufacturing hub by:
✔ Leveraging expressway infrastructure
✔ Creating investment-ready land banks
✔ Developing last-mile connectivity

Next Steps:

  • Fast-tracking remaining land acquisition
  • Global investor roadshows
  • Sector-specific policy incentives

Track UP’s industrial transformation with our updates.

Scroll to Top