H&H Aluminium Launches India’s Largest Solar Frame Plant in Gujarat.

H&H Aluminium’s new 24,000 MT/year solar frame plant in Gujarat cuts import dependence, creates 300+ jobs, and supports India’s 500 GW renewable target.

Key Highlights

✅ ₹150-crore investment in Rajkot manufacturing facility
✅ 24,000 MT annual capacity – supports 6 GW solar installations
✅ Import substitution: Cuts India’s 90-95% reliance on imported solar frames
✅ Employment generation: Creates 300+ jobs in Gujarat
✅ Revenue potential: ₹700-750 crore/year at full capacity


H&H Aluminium Powers India’s Solar Revolution with Mega Gujarat Plant

Rajkot, Gujarat – In a major boost to India’s renewable energy infrastructure, H&H Aluminium has inaugurated its state-of-the-art solar panel frame manufacturing plant in Rajkot. The facility, inaugurated by Union Minister C.R. Patil, positions India as a key player in solar component manufacturing.

Plant at a Glance

ParameterDetails
Investment₹150 crore
Area28,000 sq.m
Capacity24,000 MT/year
Solar Support6 GW installations
Employment300+ jobs

Strategic Importance

  1. Make in India Push:
    • Replaces 90-95% imports of aluminium solar frames
    • Aligns with 500 GW renewable energy target by 2030
  2. Economic Impact:
    • Expected ₹750 crore/year revenue
    • Boosts Gujarat’s solar manufacturing ecosystem

Leadership Insights

Uttam Patel, Director, H&H Aluminium:
“This is India’s largest single-location solar frame plant, built in record time. We’re proud to support domestic solar panel production.”

Vijay Kaneria, Director:
“With 280 GW solar target by 2030, this plant taps into a massive growth opportunity for allied industries.”


Market Context & Opportunities

  • Solar Frame Demand: Expected to grow 3X by 2030
  • Government Support:
    • PLI scheme for solar manufacturing
    • Customs duty on solar components to boost local production
  • Export Potential: Can serve global solar markets

Conclusion

The Rajkot plant marks a pivotal moment for India’s solar manufacturing sector by:
✔ Reducing critical import dependence
✔ Creating skilled employment
✔ Accelerating 500 GW renewable mission

Future Roadmap:

  • Full-scale production by August 2025
  • Potential expansion to meet rising demand
  • Integration with solar panel makers

Track India’s solar manufacturing growth with our updates.

Scroll to Top