RAKEZ Partners with India’s Rana Group to Develop $10B Erisha Smart Manufacturing Hub in Ras Al Khaimah.

RAKEZ & Rana Group launch 335-acre Erisha Smart Manufacturing Hub in UAE – a $10B EV, hydrogen & semiconductor mega-project set to generate 4,000 jobs and $6B annual GDP impact.

UAE-India JV to Build Future-Ready Industrial Megacity in Ras Al Khaimah

Ras Al Khaimah, UAE – In a landmark cross-border collaboration Ras Al Khaimah Economic Zone (RAKEZ) has joined forces with India’s Rana Group to develop the Erisha Smart Manufacturing Hub$10 billion advanced industrial ecosystem spanning 335 acres (15M sq ft built-up area).

Project Fast Facts

💰 Investment: $10B (anticipated)
🏗️ Scope: 25M sq ft construction across 150+ industrial units
🌱 Focus Sectors:

  • Electric & hydrogen vehicles
  • EVTOL aircraft manufacturing
  • Semiconductor production
  • Renewable energy systems
    🏙️ Mixed-Use Components: Residential, medical colleges, hypermarkets & financial districts

Why This Hub is a Game-Changer?

1. Strategic Industrial Diversification

  • Positions RAK as alternative to Dubai/Abu Dhabi for advanced manufacturing
  • Complements UAE’s Operation 300bn industrial strategy
  • Creates 4,000+ high-tech jobs

2. Clean Energy Focus

🔋 EV Ecosystem: From battery plants to charging infrastructure
♻️ Hydrogen Infrastructure: Support for fuel cell vehicles
✈️ Future Mobility: EVTOL aircraft production facilities

3. Semiconductor Ambitions

  • First major chip manufacturing investment in Northern Emirates
  • Potential tie-ups with GlobalFoundries Abu Dhabi

Leadership Perspectives

Dr. Darshan Rana, Chairman, Erisha E Mobility:
*”This hub will be the launchpad for sustainable industrialization across MENA. Our 150+ manufacturing units will redefine regional supply chains.”*

Ramy Jallad, RAKEZ Group CEO:
“RAK offers 30% cost savings over Dubai with equal connectivity. This project proves our readiness for Industry 4.0 ventures.”


Economic Impact Projections

📈 $5-6B annual GDP contribution
🛠️ 4,000+ direct jobs (20,000+ indirect)
🌍 Export Potential: 60% output destined for MEA markets


Comparative Advantage

FeatureRas Al KhaimahDubai
Industrial Land Cost$12/sqft$35/sqft
Time to License48 hours7 days
Power Costs$0.06/kWh$0.09/kWh
Port AccessRAK PortJebel Ali

Phase-wise Development Plan

2025-26:

  • Infrastructure development
  • First 20 manufacturing units operational

2027-28:

  • Semiconductor cleanrooms completion
  • EV battery gigafactory commissioning

2029+:

  • Full-scale hydrogen vehicle production
  • EVTOL prototype testing

Investor Opportunities

💡 Tier-1 Auto Suppliers: Ready-built factories available
💡 Semiconductor Firms: Subsidized cleanroom setups
💡 RE Developers: Solar/wind component manufacturing


The Bigger Picture: UAE’s Industrial Transformation

This project accelerates:
✅ Net Zero 2050 goals via clean tech manufacturing
✅ India-UAE CEPA trade agreement outcomes
✅ Diversification beyond oil (industry now 25% of UAE GDP)


Final Thoughts

The Erisha Hub isn’t just another industrial park – it’s a city-sized testbed for tomorrow’s technologies. By combining India’s manufacturing prowess with RAK’s business-friendly ecosystem, this partnership could reshape the MEA region’s industrial landscape.

Scroll to Top