Omega Seiki Enters Electric Bus Market with 9-Meter Low-Floor Model for Government Fleets.

Omega Seiki’s 9-meter low-floor e-bus (2026 launch) features 195kWh battery & 30-min fast charging, aiming for 40% government fleet market share.

Strategic Expansion Highlights

✅ New Product: 9-meter low-floor e-bus for STUs
✅ Launch Timeline: 2026
✅ Market Target: 40% segment share in government contracts
✅ Global Footprint: UAE manufacturing plant by 2025 (Africa/Middle East focus)


Technical Specifications & Competitive Edge

Powertrain Performance

ComponentSpecificationCompetitive Advantage
Motor800W (190kW peak)Higher torque for stop-start urban routes
Battery195kWh NMC chemistry200km range (AIS-039 certified)
Charging30min (0-80%) / 6hrs (full)Dual-mode flexibility for depot/opportunity charging

Operational Economics

✔ 15% lower TCO vs diesel buses (Frost & Sullivan estimates)
✔ 85% localization (leveraging existing 3W supply chain)
✔ PM e-Bus Sewa scheme eligibility


Manufacturing & Market Strategy

Production Capacity

  • India: 800 buses/year (expandable)
  • UAE Plant: Additional 500+ units/year capacity (2026)

Demand Drivers

✔ Government Contracts: 50,000 e-buses targeted under PM e-Bus Sewa
✔ Private Sector: Staff transportation, school buses
✔ Export Markets: Middle East/Africa EV transition


Leadership Vision

Uday Narang, Founder & Chairman:
*”Our e-bus combines Swadeshi engineering with global benchmarks—offering STUs a 200km solution that outperforms Chinese imports on lifecycle costs.”*


Industry Context

2025 Market Shift (Frost & Sullivan)

  • Urban Focus: 60% of demand from city transport corporations
  • Tier 2/3 Expansion: Smaller towns adopting 8-10m buses
  • Private Operators: Corporates/schools transitioning to electric

Competitive Landscape

PlayerKey OfferingOmega’s Edge
Olectra12m busesMore maneuverable 9m format
JBMMetro feeder busesHigher localization (85% vs 70%)
BYD IndiaPremium models30% cost advantage

Differentiators:
✔ Modular design for easy maintenance
✔ Telematics-ready for smart fleet management
✔ AIS-140 compliance with emergency features

Upcoming Milestones:

  • Prototype testing (Q4 2025)
  • UAE plant inauguration (Dec 2025)
Exit mobile version