Maruti Suzuki Expands Gujarat Skilling Network with 5 New Advanced Manufacturing Labs.

Table of Contents

This is a significant step forward for the automotive skilling ecosystem in Gujarat, especially given how aggressively Maruti Suzuki is scaling up its production footprint in the state.

Here is a quick breakdown of the key numbers and locations behind this expansion strategy:

New AML Locations in Gujarat

The five new Advanced Manufacturing Labs (AMLs) will be set up at ITIs in:

  • Palanpur
  • Bhavnagar
  • Surendranagar
  • Godhra
  • Dahod

Scale of Maruti Suzuki’s Skilling Footprint

The addition of these five labs expands Maruti Suzuki’s national vocational training network considerably:

MetricPrevious ScaleNew Scale (With Gujarat Expansion)
Advanced Manufacturing Labs (AMLs)18 nationwide23 across 7 States & UTs*
Total ITIs Supported2631 nationwide
Japan-India Institutes for Manufacturing (JIMs)4 (Spread across Gujarat & Haryana)

*The 7 states and union territories now include Gujarat, Haryana, Uttar Pradesh, Bihar, Madhya Pradesh, Punjab, and Chandigarh.

Funding Context: In FY 2025-26 alone, Maruti Suzuki invested ₹125 crore (INR 1,250 million) into these skill development and vocational initiatives under its CSR umbrella.

The Production Target: 2 Million Units

This skilling push directly correlates with Maruti Suzuki’s upcoming capacity double-down in Gujarat, aiming to build a localized pipeline of tech-ready workers:

  • Hansalpur Facility: Commencing its 4th production line this year, jumping from 750,000 units to 1 million units annually.
  • Sanand Plant: A brand-new facility currently under construction, designed to add another 1 million units of annual capacity.

Once both are fully firing, Maruti Suzuki’s combined capacity in Gujarat will hit 2 million vehicles per year, making a highly skilled, hands-on workforce absolutely essential to avoid localized talent deficits.