LONGi and Pertamina NRE Launch 1.6 GW Solar Manufacturing Hub in Indonesia.

LONGi’s new West Java plant with Pertamina NRE will produce 1.6GW HPBC 2.0 modules annually, boosting Indonesia’s solar independence.

Strategic Partnership to Accelerate Indonesia’s Energy Transition

Project Overview

✔ Location: Deltamas Industrial City, West Java
✔ Capacity: 1.6 GW annual production of high-efficiency solar modules
✔ Technology: LONGi’s next-gen HPBC 2.0 (Hybrid Passivated Back Contact)
✔ Timeline: Manufacturing prep begins June 2025
✔ Investment: Undisclosed (strategic JV with Pertamina NRE)


Key Strategic Benefits

1. Strengthening Indonesia’s Solar Supply Chain

  • Boosts Domestic Component Level (TKDN) to meet government mandates
  • Reduces import dependence for utility-scale solar projects
  • Creates 500+ green jobs in manufacturing & technical roles

2. Market Expansion Opportunities

🌏 Regional Demand:

  • Supports Indonesia’s RUPTL 2025-2034 target of 17.1 GW new PV capacity
  • Potential exports to ASEAN markets (Vietnam, Philippines, Thailand)

⚡ Technology Edge:

  • HPBC 2.0 modules offer >23% efficiency – ideal for tropical climates
  • Enhanced durability against humidity & high temperatures

3. Synergy with National Energy Goals

🔋 Pertamina NRE’s Role:

  • Leverages state-owned energy giant’s distribution network
  • Aligns with Indonesia’s net-zero 2060 pledge

Leadership Perspectives

Dennis She, VP of LONGi:
“This facility is a cornerstone of Southeast Asia’s solar future. Localizing production cuts costs by 20% while creating skilled jobs and technology transfer.”

Pertamina NRE Spokesperson:
“Our partnership with LONGi bridges global innovation with local energy needs, accelerating Indonesia’s just energy transition.”


Industry Impact Analysis

Indonesia’s Solar Landscape

📈 Current Capacity: ~0.5 GW operational PV
🎯 2034 Target: 17.1 GW (34X growth)
💰 Investment Needed: $12B+ to meet RUPTL goals

Competitive Advantage

  • First-mover benefit in local high-efficiency module production
  • 30% lower logistics costs vs imported panels
  • PLN procurement preference for high-TKDN projects

Technology Deep Dive: HPBC 2.0

🔬 Key Features:

  • Front-side zero busbar design → reduced shading loss
  • Smart solder strip tech → higher reliability in humid climates
  • 25-year performance warranty

🌞 Tropical Adaptation:

  • 3% higher yield vs PERC in high-irradiation conditions
  • Lower degradation rate (0.45%/year)

Implementation Roadmap

📅 2025:

  • Facility construction begins
  • Workforce training programs launch

⚙ 2026:

  • Trial production starts
  • TKDN certification process

🚀 2027:

  • Full-scale operations
  • Potential capacity expansion to 3 GW

Scroll to Top