Campus Activewear Manufacturing Facilities in India : Here’s what I found on Campus Activewear Ltd., one of India’s leading sports and athleisure footwear brands, regarding its manufacturing plants:
Campus Activewear Manufacturing Facilities in India
1. Dehradun, Uttarakhand
- The company’s first plant, commissioned in 2010 India Retailing.
- In later years, Dehradun has hosted assembly lines supporting both uppers and final shoe assembly India Infoline.
- It also became the first of Campus’s plants to obtain a BIS Quality Control Order (QCO) license on 3 July 2023 Growth Reportsforpressrelease.com.
2. Baddi (Himachal Pradesh)
- Campus added manufacturing capacity through two assembly units in Baddi India Infoline.
- Both Baddi plants obtained BIS QCO licenses: the first on 28 July 2023, and the second on 13 August 2023 Growth Reportsforpressrelease.com.
3. Haridwar, Uttarakhand
- The company commissioned a manufacturing unit focused on uppers as part of its backward integration strategy in 2020 Wealthrox.
- Another upper production facility in Haridwar was scheduled to be operational by March 2025, with a capacity of 2.4 million pairs annually Concall Analysis – read conference calls.
4. Ganaur (Haryana)
- Campus established a sole manufacturing facility in Ganaur (Sonepat district) to produce soles WealthroxConcall Analysis – read conference calls.
5. Pantnagar (Uttarakhand) – Upcoming/Under Expansion
- Campus announced a plan (as of September 2, 2025) to acquire land and buildings in Sector-05, IIE SIIDCUL, Pantnagar, spanning 47,000 sq m.
- The aim is to boost semi-finished goods (uppers and soles) manufacturing and shoe assembly: to add an annual capacity of 7.2 million pairs over the next 2.5 years Moneycontrol.
Summary Table
Location | Functional Focus | Notes |
---|---|---|
Dehradun (Uttarakhand) | Assembly (uppers & shoes) | First plant (2010); BIS-licensed (3 Jul 2023) |
Baddi (Himachal Pradesh) | Assembly lines | Two plants; BIS licenses (28 Jul & 13 Aug 2023) |
Haridwar (Uttarakhand) | Uppers manufacturing | Commissioned in 2020; new plant operational by Mar 2025 (2.4M pairs) |
Ganaur (Haryana) | Sole manufacturing | Dedicated soles plant |
Pantnagar (Uttarakhand) | Semi-finished goods & assembly (planned) | Land acquired Sept 2025; capacity addition planned over 2.5 years |
Final Overview
Campus Activewear currently operates multiple manufacturing plants across India:
- Production of uppers: at Haridwar.
- Production of soles: at Ganaur.
- Assembly (uppers + final shoes): at Dehradun and Baddi.
- Expansion underway: at Pantnagar, to further scale up both components manufacturing and assembly.
These facilities collectively support a robust backward integration strategy, enhancing Campus’s control over its supply chain and boosting its production capacity to meet growing demand.
Let me know if you’d like details on any specific plant—like annual capacity, technologies used, or workforce size!