projectindustrialbuzz.com

Kazipet Railway Manufacturing Unit On Track for 2026 Production Launch.

Kazipet Railway Manufacturing Unit : Ashwini Vaishnaw announces 2026 launch for Kazipet’s advanced rail manufacturing unit featuring robotic painting and AI systems.

Modern Coach Factory to Boost Telangana’s Rail Infrastructure Ecosystem

Kazipet, Telangana: Union Railways Minister Ashwini Vaishnaw has confirmed that production at the state-of-the-art Kazipet Railway Manufacturing Unit will commence in 2026, marking a significant milestone in India’s rail infrastructure expansion. The ₹500 crore facility, inspected by Vaishnaw alongside Union Coal and Mines Minister G Kishan Reddy, is poised to become a hub for modern rolling stock manufacturing in South India.

Key Project Highlights

✔ Production Start Date: 2026
✔ Investment: ₹500 crore
✔ Capabilities:

Strategic Importance of the Kazipet Facility

1. Fulfilling Telangana’s Industrial Aspirations

2. Technological Advancements

FeatureBenefit
Robotic Painting40% faster coating with uniform finish
Smart Warehousing30% reduction in material handling time
IoT-enabled AssemblyReal-time production monitoring

3. Economic Impact

Project Timeline & Progress

2023

2024-25

2026

Broader Infrastructure Development

The rail factory is part of ₹6,100 crore infrastructure push for Telangana including:

Ministerial Perspectives

Ashwini Vaishnaw, Railways Minister:
*”This modern factory embodies PM Modi’s vision for Atmanirbhar Bharat in rail manufacturing. By 2026, Kazipet will produce world-class coaches using robotics and AI – a giant leap from manual processes.”*

G Kishan Reddy, Coal & Mines Minister:
“Telangana’s industrial corridor gets a strategic asset. The unit will manufacture not just for Indian Railways but potentially for export markets.”

Industry Impact Analysis

Exit mobile version