Egypt’s AOI inaugurates high-voltage power tower production line with 15,000-ton capacity supporting renewable energy goals and “Made in Egypt” industrialization strategy.
Egypt Takes Major Step Toward Energy Independence with New Power Tower Factory
Cairo, Egypt – In a landmark move for domestic manufacturing the Arab Organization for Industrialization (AOI) has inaugurated a new production line for high and ultra-high voltage electricity towers at its aircraft factory marking a strategic leap in Egypt’s energy infrastructure independence.
Key Highlights of the Initiative
✅ Initial Capacity: 15,000 tons/year (scaling to 30,000 tons by 2025)
✅ Cutting-Edge Tech: Fully digitalized production line
✅ 100% Local Content: Expands on AOI’s success in telecom tower manufacturing
✅ Renewable Energy Focus: Supports Egypt’s 42% green energy by 2030 target
Why This Factory Matters for Egypt’s Future?
1. Ending Import Dependence
- Meets 100% of Electricity Ministry’s tower needs domestically
- Slashes costs & logistics hurdles for national grid expansion
- Positions Egypt for regional exports in coming years
2. Powering the Renewable Revolution
☀️ Solar/Wind Projects: Local towers for Benban Solar Park & Gulf of Suez wind farms
🔋 Energy Storage: Part of broader push to localize battery production
⚡ Grid Modernization: Critical for 65% renewables by 2040 vision
3. Industrial & Economic Boost
🔹 Jobs: High-skilled manufacturing roles in advanced welding & fabrication
🔹 Tech Transfer: German & Chinese machinery with Egyptian know-how
🔹 Export Potential: Targeting Libya, Sudan & Gulf markets
Leadership Perspectives
Mukhtar Abdel Latif, AOI Chairman:
“This factory embodies ‘Made in Egypt’ – competitive in price, global in quality. After telecom towers, power towers are our next step toward industrial sovereignty.”
Mahmoud Essmat, Electricity Minister:
“Local manufacturing is non-negotiable for our energy transition. Future renewable tenders will prioritize Egyptian-made equipment.”
Egypt’s Renewable Energy Roadmap
📈 2030 Target: 42% renewable electricity (Solar: 22%, Wind: 14%, Hydro: 6%)
📈 2040 Vision: 65% renewables with localized supply chain
🔧 Focus Areas:
- Solar cell production expansion
- Local battery storage systems
- Wind turbine component manufacturing
What’s Next?
🚀 2024-25: Ramp up to 30,000-ton capacity
🌍 2026+: Export towers to African & Arab markets
🛠️ Parallel Projects: Localize transformer & substation production
Investor & Industry Takeaways
💡 Opportunity: Partner with AOI on turnkey power infrastructure
💡 Incentives: Tax breaks for localized green tech manufacturing
💡 Watch: Tenders for solar/battery factories in 2025
Final Thoughts
By bringing power tower production home, Egypt:
✔ Secures its grid expansion amid booming energy demand
✔ Cuts fossil fuel reliance via localized renewable infrastructure
✔ Joins ranks of regional industrial hubs like Turkey & Saudi Arabia
This factory isn’t just about steel towers—it’s the backbone of Egypt’s green industrialization.